Notes
1. We had 8 men working on a glorious Sat morning, somewhat cool. (Thanks to Ken Pogue, ECM chair, and Larry Saylor, Junior Warden for organizing it). The ECW provided lunch
2. 3 projects. 1 project was completely finished (C), One is a work in progress to be completed next week (A). A third one needs external review.(B)
A. New water pipe from the parish house to the church to be installed by a plumber on Monday, May 13. We need to dig trenches to find the main line from the parish house and prepare the connection for the plumber. The line going into the church needs to be reviewed. Finally, refill the trenches and make sure firm.
DONE! Awaiting the plumber on Monday. (Photos before and after).
B. Handicapped ramp needs painting. Scraping needs to be done. Concern was wood damage. PARTIALLY DONE. Some scraping done but much remains. It is very time consuming! We need a third party to review and advise on the stability of the ramp and whether the ramp can be repaired and life extended. (Photos before and after).
C. Segment on the fence in the rear graveyard was bent. DONE! (Photos before and after).
Photo Gallery of the day